Token as a Service

The Exit Clause: Portability, Data and Token-Service Contracts

Exit terms for token services: what data and artifacts must be exportable, how much notice is fair, what capacity handover looks like, and how to test portability before signing.

The Exit Clause: Portability, Data and Token-Service Contracts
Token as a Service · Inference Watch

At a glance

  • Exit is a data problem before it is a pricing problem.
  • The contract should define the export format, the notice period and the post-termination retention window.
  • Capacity handover needs a date, not a best effort.
  • Run an exit rehearsal during onboarding, not at renewal.

Procurement teams spend most of their attention on price, quality and SLA. The clause that decides how much the relationship will cost to leave is usually read last. For token services that is a mistake. Switching costs are dominated by data, configuration and capacity, and all three can be specified in advance.

This piece is about the exit clause as an operating document: what it should contain, how to test it, and why a rehearsal at onboarding is worth more than a promise at renewal.

Exit is a data question first

Most providers will say the buyer owns its data. Fewer will say what “own” means in practice. The useful version is a list.

  • Request and response logs with timestamps and request IDs, exportable in a documented schema.
  • Usage and billing records for the full audit period, including retries and cache events.
  • Prompts, templates and routing configuration, including version history if the service manages it.
  • Evaluation results produced inside the provider's environment, if the buyer relied on them for acceptance.
  • Model artifacts, where the buyer supplied or fine-tuned them, together with tokenizer and serving configuration.

The contract should name the format, the delivery mechanism and the retention window. “Available on request” is not a format. For the metering side of the same records, see Metering Disputes.

Notice, capacity and the handover date

Leaving a token service is a traffic migration. The new provider needs capacity before the old one stops serving, and the old one needs a reason to keep capacity available during the overlap. Two dates make this work: the notice date and the handover date, with a defined service level in between.

A 60 to 90 day notice period is common for production workloads. The number matters less than what the provider commits to during it. If the agreement allows the provider to deprioritize a departing customer, the notice period is a formality. The clause should keep the SLA in force until the handover date and cap any price increase during the transition.

Model artifacts and configuration drift

For standard token services the artifact question is smaller: the buyer is consuming a model, not owning it. For BYOM or fine-tuned deployments it is central. Exporting weights without the tokenizer, quantization level and decoding defaults does not reproduce the service. Configuration is part of the artifact.

Configuration drift is the quieter risk. If the provider changed a runtime or a default during the contract, the exported setup may not match what the buyer evaluated. Monthly configuration snapshots, stored by the buyer, make the exit reproducible. See Bring Your Own Model for the split of obligations that makes this practical.

Run an exit rehearsal

The only reliable test of an exit clause is a rehearsal, and the cheapest time to run one is onboarding.

  1. Export a production-like dataset and configuration using the documented process.
  2. Load it into a second environment, even a small one.
  3. Replay a fixed evaluation set and compare outputs and cost per completed task.
  4. Record how long the export took and what was missing.

An afternoon of rehearsal produces a list of gaps that no amount of contract reading will reveal. It also changes the negotiation: a provider that knows the buyer has tested the exit process tends to document it better.

What we watch

  • Whether the export schema is documented or described in prose.
  • Whether the SLA survives the notice period.
  • Whether configuration history is available to the buyer.
  • Whether deletion is certified after the export window closes.

An exit clause is not a threat to the relationship. It is the reason the relationship can be priced honestly. A provider confident in its service should be able to describe how a customer leaves it. If that description is vague, the switching cost is being priced somewhere — probably into the renewal. For how contract shape feeds back into serving economics, see Procurement Is the Transmission Belt.

Questions buyers ask

What has to be exportable when leaving a token service?

Request and response logs, usage and billing records, prompt templates and configuration, evaluation results, and any fine-tuned or uploaded model artifacts. Formats should be machine-readable and agreed in advance.

How much notice should an exit clause require?

Enough to cover the traffic migration and the new provider's capacity lead time, typically 60 to 90 days for production workloads. Longer notice is acceptable only if the provider commits to capacity during the notice period.

Is a data-deletion clause enough to cover exit?

No. Deletion protects the provider's copies; exit protects the buyer's ability to keep operating. The contract needs both: an export window before deletion and a deletion certificate after it.

Filed in Token as a Service. The wider frame — how serving cost and token quality travel into price — is in The Transmission.

IW

Inference Watch Research

Inference Watch covers AI compute and inference infrastructure. Company Watch items are reproduced with attribution and are not independently verified.